integrated rock drill and splitter sold to Oman

Integrated Rock Drill and Splitter Sold to Oman

The customer was looking for an excavator attachment that could handle both drilling and splitting. They contacted us with a clear objective. They needed a compact yet powerful solution that could be mobilized quickly between job sites. Our integrated rock drill and splitter configuration is suitable for both road cutting and foundation excavation. It has received a lot of good feedback since it was manufactured. After 2 weeks of discussion, we have reached a cooperation agreement. The integrated rock drill and splitter was sold to Oman last month.

integrated rock drill and splitter sold to Oman
integrated rock drill and splitter sold to Oman

Parameters of the Integrated Rock Drill and Splitter Sold to Oman

ModelYG-130
Suitable Excavator20T-36T Excavator
Maximum Horizontal Splitting Height9475mm
Maximum Vertical Splitting Height6715mm
Maximum Splitting Depth6705mm
Maximum Splitting Distance10225mm
Pilling Beam Length3875mm
Drilling Advance Stroke2000mm
Maximum Drilling Thrust Force50KN
Maximum Drilling Pull Force32KN
Piling Advance Stroke1500mm
Maximum Piling Thrust Force160KN
Maximum Piling Full Force100KN
Hydraulic PressureMax. 35Mpa
Hydraulic FlowMin. 240L/min
Weight4200kg
Dimensions4210*1400*1785mm
Operation ModeRemote Control

Click Here for a Free Quote

Why Choose Integrated Rock Drill and Splitter for Excavator?

  • Efficiency boost: Integrated rock drill and splitter reduces setup time and workflow friction.
  • Space saver: Fewer machines means a leaner site footprint and neater workflow.
  • Syncopated power: Coordinated drilling and splitting can optimize cycle timing and reduce idle periods.
  • Transport ease: A single unit is quicker to move between sites or tasks than two separate devices.
  • Maintenance simplicity: One machine to service, fewer spare parts, streamlined support.
excavator rock drill and splitter
excavator rock drill and splitter

How Does It Work in Practice?

  1. Drilling phase: The integrated unit drills a precise borehole to the desired depth and diameter. The borehole acts as a guide for the splitting action and often serves as a conduit for dust extraction or debris clearance.
  2. Alignment and feed: The operator aligns the splitter to the borehole, ensuring the friction or shear lines in the rock are favorable for a clean split.
  3. Splitting phase: The splitter applies controlled force along the borehole, creating a clean fracture and breaking the rock into desirable segments. Depending on the model, multiple splits can be achieved with cyclic strokes.

If you are also looking for the integrated rock drill and splitter, welcome to contact us and get more details.

Scroll to Top